Hanked

Hanked

2016. In September 2008, the parties involved in the Rail Baltica project signed a work-sharing and commitment agreement. This has been agreed on the administration and technical design side of the construction phase of the project.

The cross-border activities in the project, as well as activities with a high degree of commonality, such as studies and design, are the responsibility of the RB Rail AS Joint Undertaking. RB Rail AS will also organise the procurement of construction materials, where joint procurement provides economies of scale.

Procurement of construction activities, both for the railway embankments, bridges-tunnels-roads, depots and stations and for the main construction of the railways, will be carried out by and under the responsibility of the three Baltic States for the activities on their territory. More information on procurement activities and responsibilities can be found here.

Hankenumber: 287896
Väljakuulutamine: 24.12.2024
Osalemise tähtaeg: 18.02.2025
Korraldaja: osaühing Rail Baltic Estonia
Käimasolev hange
Hankenumber: 288891
Väljakuulutamine: 09.01.2025
Osalemise tähtaeg: 12.02.2025
Korraldaja: Transpordiamet
Käimasolev hange
Hankenumber: 288664
Väljakuulutamine: 06.01.2025
Osalemise tähtaeg: 11.02.2025
Korraldaja: Transpordiamet
Käimasolev hange
Hankenumber: 288681
Väljakuulutamine: 03.01.2025
Osalemise tähtaeg: 10.02.2025
Korraldaja: Transpordiamet
Käimasolev hange
Hankenumber: 288555
Väljakuulutamine: 03.01.2025
Osalemise tähtaeg: 07.02.2025
Korraldaja: Transpordiamet
Käimasolev hange