The list of national roads can be found at: https://www.riigiteataja.ee/akt/128062015003 from the appendix.

Harju I – Ülemiste–Soodevahe (TREV-2 Group)


The condition of the roads is good.

Road surfaces are cleaned daily with a brush. Additional maintenance and cleaning work is carried out if necessary to ensure road maintenance. On Suur-Sõjamäe Bypass, Tallinn–Lagedi Road, Nuia Street and Visase Street, the road surface and traffic control devices (traffic signs) are cleaned as needed.

The facility is served by approximately 14 tipper semi-trailers per day, and the daily transport capacity is approximately 2500-3000 tons.
The Huntaugu I sand quarry, the Väo quarry, the Väo VIII limestone quarry, and the Liivalaia VIII sand quarry are used for the supply and utilization of materials.

The following route is mainly used for transport: Kiiu–Soodla road (road no. 11105) – Tallinn–Narva highway (road no. 1) – Tallinn ring road (road no. 11) – Juhan Smuuli road (road no. 7841171) – Tallinn–Lagedi road (road no. 11290) – Suur-Sõjamäe bypass (road no. 7841235) – Nuia street (road no. 7841723) – Visase street (road no. 7841650) – Betooni street (road no. 7841162) – Paneeli street (road no. 7841160) – Tallinn–Saku road (road no. 11340) – Tallinn ring road (road no. 11).

Harju II – Soodevahe–Kangru (Verston)

The condition of the roads is good.
Sweeping tractors and a vacuum truck are in use on the roads.

Transport takes place with approximately 12 semi-trailers on the following road sections:

  • Tallinn Ring Road (road no. 11, km 0–10,5)
  • Tallinn–Narva highway (road no. 1, km 6–37)
  • Kiiu–Soodla road (road no. 11105, km 1–4)

In addition, approximately 28 semi-trailers travel on the following road sections:

  • Tallinn–Tartu highway (road no. 2, km 11,5–15,0)
  • Järveküla–Jüri road (road no. 11330, km 5,6–9,5, road no. 1136 km 0.-0,8; Vaida–Urge road or road no. 11202 km 5,2-7)

Harju III – Kangru–Saku (INF Infra)

The condition of the roads is satisfactory.
State roads no. 11509 and no. 11159 are being swept.
There is mainly intra-object transport and in addition:

  • On the Sutlema–Aespa–Tõdva–Viljandi road–Kangru route from 5 to 9.10 October with six semi-trailers.
  • From the Harju 3 Saku site via the Tallinn Ring Road to the Väo quarry with three semi-trailers.
  • From the Harju 3 Kangru site to the Harju 3 Saku site with four semi-trailers.
  • From the Reinu limestone quarry along the Viljandi highway to the Kangru area on 5-6.10 October with 2 semi-trailers.
  • From Männiku Betoonimeistri via Tallinn Ring Road to the Harju 3 Kangru site only 6.10 with three semi-trailers.
  • From the Harju 3 Saku site along the Tallinn Ring Road to the Väo quarry with four semi-trailers.

Harju IV – Saku–Harju County/Raplamaa border (Merko & GRK)

The condition of the roads is good.
A water bucket and brush are used to maintain roads.
From October 5 to 9, 2026, the volume of transport is forecast to be the same on all working days.

  • The largest transport volume is on the route from the Väo quarry via Road 11 and Road 15 to the Kirdalu–Kiisa road, where ten semi-trailers are planned each day. From there, transport moves to the site via a viaduct.
  • Three semi-trailers per day are planned on the route from the Männiku quarry via Road 11 and Road 15 to the Kirdalu–Kiisa road and further via the viaduct to the site.
  • Transport to the Kiisa emergency substation will be carried out on two routes. From the Männiku quarry, the route will run via Road 11, Road 15 and Tõdva–Hager, and from Sutlema, via Tõdva–Hager. Five semi-trailers per day are planned for both routes.
  • In addition, one semi-trailer per day is planned on the route from Sutlema to the site via Tõdva–Hager, Road 15, Hao Road and Soo Road.

Harju V – Soodevahe traffic interchange (TREF Nord)

The condition of the roads is good.
As needed, roads are cleaned with a brush and traffic signs and signposts are washed.
Transport takes place from the Väo Paas quarry and the Soodla II sand quarry with 10 trucks, capacity 1500 tons per day.

Rapla I – Harju County/Rapla County border – West (Verston)

The condition of the roads is satisfactory.
A brush machine operates daily on the site.

From October 5 to 11, material transport is planned from four quarries: Reinu, Männiku, Harju 2 and Mustu quarries.

• Transportation from the Reinu and Männiku quarries takes place from Monday to Friday, and three trucks are used in each direction.
• On the same days, transports will take place from the Harju 2 quarry, from where ten trucks will transport material.
• Transportation from Mustu quarry will begin on Tuesday, October 6, and will continue until Friday, October 9. 15 trucks will be used on this transportation route.
• A total of 16 cars are scheduled for transportation on Monday and 31 cars per day from Tuesday to Friday.

Rapla II – Loone–Hagudi (Verston)

The condition of the roads is satisfactory.
You will be cleaned with brush trucks with a dipping function, which are kept in constant readiness.

Transportation takes place within the facility and in addition:

• From Künka quarry to section 2 with 4 trucks and 1 semi-trailer.
• From Reinu quarry to Loone region with 7 semi-trailers.

Rapla III – Hagudi–Alu (Tariston)

The condition of the roads is satisfactory.

Transports take place from the Hertu quarry, the Reinu III limestone quarry and the AS Silikaadi quarry.

Transport from the Hertu quarry takes place with two semi-trailers along roads no. 15, 20141, 20131 and 20113.

INF Maavarad OÜ transports material from the Reinu III limestone quarry with four semi-trailers. The transport takes place along road no. 20113 from the quarry to the Kuku viaduct.

Soil transports are also taking place in Pärnu I section 8 with semi-trailers along road no. 20141.

Rapla IV – Alu–Kärpla (Verston)

The condition of the roads is satisfactory.
A water-brush truck is used on the Reinu quarry road if necessary. If necessary, a water-brush truck is also used on the Mainer Sillaotsa, Sokkel Sonni and Rüütja quarry roads.
Transportation takes place:

  • Material transportation is planned from the Reinu, Raja, Rinnak and Ahekõnnu quarries.
  • It is planned to transport 1000 tons of material per week from the Trev-2 Reinu quarry with four trucks.
  • The transport volume from Marina Minerals' Rinnak quarry is 10,000 tons with eight trucks, and from Verston's Ahekõnnu quarry, 7000 tons with ten trucks. A water and brush truck will be used to clean the transport routes if necessary.

Rapla V – Kärpla–Selja (TREV-2 Group)

The condition of the roads is satisfactory.
If necessary, a brush truck is used to clean the roads.
Transportation takes place:

  • From the Ahekõnnu quarry with 5-7 semi-trailers.
  • From the lime quarry with 12-17 semi-trailers.
  • From Reinu quarry with 10-14 semi-trailers.
  • From Akimatsi II quarry: 8-13 semi-trailers.
  • From the sand quarry: 2-4 semi-trailers.

Pärnu I – Selja–Tootsi (Tariston)

The condition of the roads is satisfactory.
You will be cleaned with water brush trucks and a brush tractor.

Gravel is being transported from the Ahekõnnu gravel quarry to the construction site along trunk road no. 27 and the Kootja and Reichenau forest roads.

7-8 tipper semi-trailers are used, the estimated transport volume is 6000 tons.

Transportation also takes place from the Kobra quarry to the railway land on the following route: Vändra-Lokuta-Lelle road (road no. 19234) – Pärnu-Paide-Rakvere road (road no. 5) – Aluste-Kergu road (road no. 58).


Construction companies TREF Nord, Verston, Infrastructure, INF Infrastructure, TREV-2 Group, Merko & GRK Oy We use a variety of cleaning measures on a daily basis to ensure the cleanest and safest roads possible throughout the work. We also cooperate with local governments and the Estonian Transport Board in providing operational information.

What we have done and what we can still do:

  • more frequent cleaning of roads;
  • stricter wheel washing and cleaning procedures during field trips to sites and mines;
  • separate response teams in more problematic locations;
  • adjusting transport arrangements during sensitive times

Questions and contacts

For construction-related road problems, write: complaint@rbe.ee We will respond within 5 business days.

If a question or problem concerns a specific construction section, the quickest way to get information is from the relevant section's website or by contacting the builder. Information can be found by section. FROM HERE.

We thank the community for their patience and feedback. Together with our partners, we are doing everything we can to keep traffic safe and the roads as clean as possible.

How did this story make you feel?
Joyfully
0
Surprised
0
Smarter
0
Regardless
0
Sad
0
Angry
0